Taiz Medical Center

Year: 1999

City: Taiz

Type: New General Hospital – 200 Beds

 

Project Synopsis:

This project was designed by CHD – Lebanon.

UHS was involved in:

Reviewing architectural plans

Preparation of loaded floor layout plans (scale 1:100), room data requirement drawings (scale 1:20) showing equipment positions, services and requirements, both in plan and elevation.

Preparation of equipment specifications, room schedules, equipment schedules and BOQ.