Supervision of Installation & Commissioning, Training and Handing over

supervision

UHS staff includes a team of specialized technical personnel in various medical equipment fields. This team is available to assist clients in the proper review and approval of installation drawings, supervision of pre-installation site preparation, installation, testing and commissioning, and handing-over process.

This involves a systematic step-by-step process of review and analysis of the medical equipment manufacturers’ shop drawings, ensuring their correct adaptation into the project rooms specific layouts, and their integration into the contractors’ general shop drawings. Then, there will be a detailed survey of the site preparation for coordinated medical equipment MEP (mechanical electrical plumbing) utility provisions and fixation requirements. Consequently, this leads to supervision over the installation of the medical equipment, testing and commissioning and handing-over of completed sites all in accordance with the contracted documents, approved drawings, and specifications.