Recent Posts by admin

About: admin

Cleveland Clinic (CCAD)

Year: 2011 City: Abu Dhabi Type: New General Hospital – 360 Beds   Project Synopsis: UHS was involved in the shop drawings review, supervision over installation, testing & commissioning....

Boston University Institute

Year: 2007 City: DHCC- Dubai Type: New Dental Clinic   Project Synopsis: Boston University Institute for Dental Research and Education, Located in The J&J building in DHCC, Dubai. The intent of our Interior Design Concept was to create a place Conducive of teaching and learning along with patient care Considerations; and aims at creating a welcoming yet comfortable Environment with a contemporary feel using modern...

Dukhan Western District Hospital

Year: 2004 City: Dukhan Type: New General Hospital – 100 Beds   Project Synopsis: UHS was involved in this project from its inception, including revision of all medical planning specifications, procurement management, supervision & installation, testing & commission & IT selection, pre-commissioning services, and hospital management manuals....

Al-Ahli Hospital

Year: 1998 City: Doha Type: New General Hospital – 200 Beds   Project Synopsis: UHS was involved in this project from its inception, including revision of All medical planning specifications, procurement management, Supervision & installation, testing & commission & IT selection, Pre-commissioning services, and hospital management manuals. The Hospital was opened in July 2004....

Al-Qarma Hospital

Year: 2013 City: Al-Anbar Type: New General Hospital – 100 Beds   Project Synopsis: UHS was involved in this project from its inception, including medical Planning, equipment planning, Interior design, IT services, Electro-mechanical, supervision over installation, testing & commissioning Services....

Al-Nahrawan Hospital

Year: 2013 City: Baghdad Type: New General Hospital – 200 Beds   Project Synopsis: UHS was involved in this project from its inception, including medical Planning, equipment planning, interior design, IT services, medical Equipment procurement, electro-mechanical, supervision over installation, Testing & commissioning services....

Basra Children’s Hospital

Year: 2006, 2010 City: Basra Type: New Pediatric Hospital & Radiotherapy Center – 96 Beds   Project Synopsis: UHS was involved in this project from its inception, including revision of All medical planning specifications, procurement management, supervision & installation, testing & commission & IT selection, pre-commissioning services, and hospital management manuals....

Sheikh Zayed Hospital

Year: 1992 City: Al-Rabat Type: New General Hospital – 220 Beds   Project Synopsis:   UHS was involved in: Reviewing architectural plans. Preparation of loaded floor layout plans (scale 1:100), room data Requirement drawings (scale 1:20) showing equipment positions, Services and requirements, both in plan and elevation. Preparation of equipment specifications, room schedules, equipment Schedules and BOQ. Evaluation of tender submittal. Supervision over installation...

Secondary Cancer Centre of Tangiers

Year: 2008 City: Tangiers Type: 50 Beds – Cancer Center   Project Synopsis: UHS was involved in this project from its inception, including revision of the space program, preparation of the zoning plans, single line plans, equipment planning, specification of equipment, procurement management, supervision & installation, testing & commission & IT selection, pre-commissioning services, and hospital management manuals....

Central Hospital of Sudan

Year: 2011 City: Omdurman Type: New General Hospital – 120 Beds   Project Synopsis: UHS was involved in this project from its inception, including revision of all Medical planning specifications, procurement management, supervision & Installation, testing & commission & IT selection, pre-commissioning Services and hospital management manuals....